BEST Project in Chengdu

Project Introduction

Classic Project Introduction (14)

Layout(Inbound floor area)

Outbound

Classic Project Introduction (17)

Layout(Outbound platform area )

Inbound

Classic Project Introduction (15)

Layout(Inbound floor area)

Outbound

Classic Project Introduction (16)

Layout(Outbound floor area)

Project Features

Project Scale is large

BEST project budget is around RMB 200 Million super big project. As this system integrator ,it took 8 months for the whole project with the conveying line length at.

Switching steps are complicated

1. The construction process involved complex switching steps; 2. First construct new outbound area and disassemble old outbound after switch to new outbound; 3. Then construct new inbound matrix and complete the old and new inbound matrix switch;  4. Inbound cross belt switch; 5. The final detailed stages close.

Project handed over for use

Achievements

Classic Project Introduction (20)
Classic Project Introduction (21)
Classic Project Introduction (22)
Classic Project Introduction (23)
Classic Project Introduction (25)
Classic Project Introduction (26)

  • cooperative partner
  • cooperative partner2
  • cooperative partner3
  • cooperative partner4
  • cooperative partner5
  • cooperative partner6
  • cooperative partner7
  • cooperative partner (1)
  • cooperative partner (2)
  • cooperative partner (3)
  • cooperative partner (4)
  • cooperative partner (5)
  • cooperative partner (6)
  • cooperative partner (7)