J&T Express Project

Project Introduction

Overall project layout

J&T Express Project (1)

Outbound

Workflow layout for different function (outbound)

Inbound

Workflow layout for different function (inbound)

Project Features

Project construction

This project was completed in three times delivery and disassemble the original outbound matrix and retrofit old modular equipment.

Expand original outbound matrix .As the matrix sorter is still under running ,the construction work required high working strength.

Storage area floor is not flat which made the machine installation work difficult

Project scale

Overall project include 3 storages: inbound (19 unloading dock), outbound (24 unloading dock), matrix, and one set cross belt sorter.

Project leadtime

Total construction time took 5 months and overall project control is difficult.

Achievements


  • cooperative partner
  • cooperative partner2
  • cooperative partner3
  • cooperative partner4
  • cooperative partner5
  • cooperative partner6
  • cooperative partner7
  • cooperative partner (1)
  • cooperative partner (2)
  • cooperative partner (3)
  • cooperative partner (4)
  • cooperative partner (5)
  • cooperative partner (6)
  • cooperative partner (7)